Renovation and HDB
What is HIP?
HIP, the Home Improvement Programme, is HDB's highly subsidised programme for keeping older flats in good condition, fixing common problems such as spalling concrete and old waste pipes. It also offers optional upgrades, including a new toilet with fresh tiles and waterproofing, and works inside each flat take up to 10 working days.
Also called: Home Improvement Programme, HDB HIP, HIP upgrading

Key facts
What it means
HIP was introduced in 2007 to replace the earlier Main Upgrading Programme. It was first offered to flats built up to 1986, about 320,000 flats, and in 2018 extended to another 230,000 flats built between 1987 and 1997.
HIP covers essential repairs, optional upgrades and fittings for seniors:
The full Optional package is worth about $11,990. Singapore Citizen households pay 5% to 12.5% of it depending on flat type, and the Government pays the rest.
HERA is an independent bathroom retailer and is not a HIP contractor. Our HIP guide covers the programme in more detail, with links to HDB.
How it works
A HIP round goes ahead only if at least 75% of the block's eligible Singapore Citizen households vote for it. After a successful poll, it runs in three stages.
The toilet upgrading package covers a new waterproofing membrane, wash basin, floor and wall tiles, louvred vent, toilet door, grab bar and pedestal pan. If you leave items out, you still pay for the whole package and the uninstalled items are not given to you.
Opting out needs a water test, in which the toilet's floor outlet is plugged, the floor is flooded to at least 10mm for 4 hours, and the slab underside and wall bases are checked for leaks. Owners can opt out only if the toilet passes, which prevents ceiling leaks in the flat below.
HIP works are covered by a 1-year defects liability period. The contractors fix faults reported within a year of completion.
In HDB, BTO and condo homes
You must remove and reinstate any fittings, fixtures or cabinets that block the works, at your own cost. A vanity or mirror cabinet put in just before HIP may have to come down again.
The toilet package includes no storage. There is a basin and a pedestal pan, but no vanity cabinet, mirror cabinet or shelving.
Right after HIP is the best time for new bathroom cabinets. HERA vanity cabinets are fully waterproof, from 500 to 800mm wide, from $711, and we can measure the new toilet once the works are done.
The new pedestal pan meets at least a 2-tick water efficiency rating, as PUB requires. If the flush feels weaker, HDB suggests holding the flush slightly longer.
A second round, HIP II, is planned for flats around 60 to 70 years old. Plan bathroom spending around both rounds.
Mistakes to avoid
Installing a new vanity or mirror cabinet just before your block's HIP.
Wait until the HIP works are finished, then fit the new cabinets.
Opting out of toilet upgrading because the tiles look fine.
The water test decides it. If you skip the test, or skip the upgrading after a failed test, HDB holds you fully responsible for ceiling leaks into the flat below for 6 years.
HIP (Home Improvement Programme) questions
What is HIP in HDB?
The Home Improvement Programme, HDB's subsidised programme for older flats. It covers essential repairs plus optional upgrades such as a new toilet.
What is the HIP water test?
A flood test of the toilet floor for owners who want to opt out of toilet upgrading. If it leaks, toilet upgrading is needed.
How much does HIP cost?
Essential works are free for Singapore Citizens. For the full Optional package, citizens pay $599.50 for a 1, 2 or 3-room flat, $899.25 for a 4-room, $1,199.00 for a 5-room and $1,498.75 for an executive flat, after the works are done.
Does HIP include bathroom cabinets?
No. Plan storage for after the works.





