How to hire a bathroom contractor in Singapore

A bathroom contractor in Singapore has to be on HDB's Directory of Renovation Contractors to work in an HDB flat, and needs a permit before hacking tiles. Here is who does which job, what a fair quote lists, and the order the works run in.

By the HERA Bathroom teamUpdated 11 min read
Homeowners and their contractor looking at a floor plan in a stripped HDB bathroom
Illustration: a site meeting in an HDB toilet after hacking, before waterproofing.
On this page
  1. Who does what in a bathroom renovation
  2. Do you need a contractor at all?
  3. HDB rules every bathroom contractor in Singapore must follow
  4. How to check a contractor before you pay
  5. What a fair quotation lists
  6. What a toilet renovation costs in Singapore
  7. The order of works, from hacking to handover
  8. Handover: what to check before the last payment
  9. Where HERA fits in
  10. Questions people ask about bathroom contractors
The short answer

Hire a contractor listed on HDB's Directory of Renovation Contractors, and get an itemised quote that names the waterproofing, the plumber and the payment stages. Then choose your fittings before tiling starts.

  • Check the DRC listing on HDB's site before you pay a deposit. HDB requires it for every HDB flat.
  • Hacking tiles needs an HDB permit, and new BTO flats must wait 3 years before removing toilet finishes.
  • Waterproofing is the job that matters most. Ask for the membrane and a ponding test in writing.
  • Only swapping fittings? You may not need a contractor at all. That part is what we do.
1,332people asked us about renovation on WhatsApp this year
3 yearsbefore toilet tiles can come off in a new BTO flat
9am to 5pmweekdays only, for hacking and other noisy works
$500 to $5,000penalties for listed contractors who break HDB's rules

Who does what in a bathroom renovation

Most people asking us about renovation expect one company to do everything. In practice a bathroom contractor in Singapore runs the works, a licensed plumber does the pipes, and the fittings often come from a supplier like us.

Who handles each layer of an HDB bathroom 1 2 3 4 5
1Tiles: hacking, overlay and retiling. Your contractor. 2Waterproofing membrane under the tiles, turned up the walls. Your contractor. 3Floor screed and falls to the trap. Raising the floor needs an HDB permit. 4Water pipes and the toilet outlet: a PUB licensed plumber. 5Vanity, basin, toilet bowl, tub and mirror: we supply and install them.
  • Contractor: hacking, waterproofing, tiling, kerbs, ceilings and the HDB permit. In an HDB flat they must be on HDB's Directory of Renovation Contractors.
  • PUB licensed plumber: since 1 April 2018, only licensed plumbers may do water service and sanitary plumbing work, including fitting a toilet bowl.
  • HERA: we supply the fittings and our team installs them like for like, on the water and waste points you already have.
  • You: check the contractor, sign an itemised quote, choose the fittings early and inspect before the last payment.

We are not a renovation contractor. We do not do tiling, overlay, waterproofing or repiping, and our bundles do not include renovation works.

What we can do is make sure the fittings you want suit the pipes and the space, before your contractor starts.

Do you need a contractor at all?

Many people who message us about "renovation" only want new fittings on the same pipes. That job needs no contractor, no permit and no hacking.

Do you need a bathroom contractor? Only swapping a vanity, basin, toilet bowl or tub on the same pipes? Yes: no contractor needed. Our team swaps it like for like. No Moving pipes, water points or the toilet? Yes: contractor and licensed plumber. It runs through the floor slab. No New floor or wall tiles? Yes New BTO, under 3 years old? Yes: overlay only. No finishes come off. DRC contractor. No: hack and retile. DRC contractor, HDB permit, ponding test.
Tiles staying as they are? A shower screen needs no HDB approval, but the floor slab must not be touched. For anything else, follow the path to see who you need.

If you are only replacing fittings, our HDB toilet bowl replacement guide and bathtub installation without hacking walk through the day.

HDB rules every bathroom contractor in Singapore must follow

These come from HDB and PUB, not from contractors' marketing. A good contractor will raise them before you do.

RuleWhat it says
Approved contractor (HDB)The renovation contractor you engage must be listed in HDB's Directory of Renovation Contractors (DRC). Windows need a BCA-approved window contractor on the same list.
Permit (HDB)Needed to remove floor finishes, hack or alter walls, or raise a bathroom's floor level. The contractor applies with a floor plan, and some works also need a Professional Engineer.
New flats (HDB)Wait 3 years before removing wall or floor finishes in toilets. Overlaying tiles is the way round it.
Shower screens (HDB)No HDB approval needed, but the floor slab must not be tampered with.
Plumbing (PUB)Water service and sanitary plumbing work, including fitting a toilet bowl, is for PUB licensed plumbers only.
Toilet bowls (PUB)New WCs must carry at least 2 ticks under the water efficiency labelling scheme.
Neighbours (HDB)Your contractor should tell the neighbours before works start.
Penalties (HDB)Listed contractors who break HDB's terms face demerit points, penalties of $500 to $5,000, suspension or removal from the list.

Summarised from HDB's guide to renovating your flat, MND's answer on complaints against renovation contractors and HDB's renovation information page, checked 24 November 2026. HDB's guidelines decide; check them for your flat.

HDB renovation hours by day of the week General works most other works Noisy works hacking, removing tiles Monday 9am to 6pm 9am to 5pm Tuesday 9am to 6pm 9am to 5pm Wednesday 9am to 6pm 9am to 5pm Thursday 9am to 6pm 9am to 5pm Friday 9am to 6pm 9am to 5pm Saturday 9am to 6pm None Sunday None None Public hol. None None
When work is allowed in an HDB flat. Noisy works also stop on the eve of major public holidays, so a hacking job that starts on a Friday before a long weekend loses days.

How to check a contractor before you pay

These take about ten minutes. Do them before the deposit, not after.

  1. Look them up on HDB's listSearch the company on HDB's "Looking for Renovation Contractors" e-Service. If it is not there, it cannot renovate an HDB flat.
  2. See work like yoursAsk for photos of HDB toilets they finished, ideally the same flat type and age as yours, and who their waterproofer is.
  3. Get three quotes for the same scopeGive every contractor the same list: hack or overlay, which walls, which pipes, which fittings. Only then are the totals comparable.
  4. Ask who holds the permitFor hacking or a new floor level, the contractor applies to HDB. Ask for a copy before work starts.
  5. Name the plumberPipe work and the toilet bowl need a PUB licensed plumber. Ask who it is.
  6. Tie payments to stagesA small deposit, then payments as stages are finished and checked, with the last one after handover.

CaseTrust is a bonus, not a substitute. Some renovation firms are CaseTrust accredited, a voluntary scheme run by the Consumers Association of Singapore.

The DRC listing is still the must-have for an HDB flat.

What a fair quotation lists

A quote that only says "toilet renovation, lump sum" is hard to check. A fair one breaks the job into lines you can tick off as each is done.

What an itemised toilet renovation quote should include Quotation: common toilet Company, UEN, DRC listing, date Hacking and disposalwhich walls, floor area Waterproofingproduct, layers, turn-up, ponding test Floor screed and fallsto the floor trap Tilinglabour, and who buys the tiles Plumbingby a PUB licensed plumber HDB permitapplied by the contractor Fittingswho supplies, who installs Payment stagestied to finished work Warrantyin writing
The lines to look for. If a quote has no waterproofing line, or the fittings are a single "supply and install" figure, ask for it to be broken down.

Signs of a careful quote

  • Waterproofing named, with a ponding test before tiling
  • Areas and walls listed, so extras are easy to spot
  • Payments tied to stages, the last after handover
  • A written warranty on workmanship and leaks

Ask before you sign

  • One lump sum for the whole toilet
  • A large deposit before any work starts
  • "Waterproofing included" with no product or test
  • No mention of who holds the HDB permit

What a toilet renovation costs in Singapore

Published 2026 cost guides put a full renovation of one HDB toilet at roughly $3,000 to $8,000, and up to about $17,500 once condos, landed homes and premium work are included. Where your job lands depends on the lines below more than on the contractor's name.

ChoiceLower costHigher cost
Old tilesOverlay on topHack off and redo waterproofing
PipesKeep every point where it isMove water points or concealed pipes
TilesStandard sizes, labour onlyLarge format or feature walls
Ceiling and doorKeep themNew false ceiling, new door frame
FittingsChoose in one go, installed togetherBought piecemeal, several install trips

Range from published 2026 cost guides, including MoneySmart and Livspace. These are indicative; only an itemised quote for your toilet is a price.

Fittings are usually priced separately from the works. Our prices are on each product page, and the Vanity System Bundle covers a vanity and a toilet bowl or shower panel, installed, for $3,330.

The order of works, from hacking to handover

A toilet that is hacked and retiled runs in this order, because each layer covers the one before. Knowing it tells you when to check, and when to book the fittings.

Illustration: three stages of a toilet that is hacked and retiled. Swipe to see each one.
  1. Plan, choose fittings, get the permitDecide the vanity width, toilet bowl and any bathtub now, so the pipes and tiles suit real sizes. The contractor applies to HDB and tells the neighbours.
  2. HackingWeekdays, 9am to 5pm only. The old tiles and screed come off and the pipes are capped.
  3. PipesA PUB licensed plumber changes or extends the water and waste pipes, before anything is covered.
  4. Waterproofing and ponding testThe membrane goes on the floor and up the walls, then the floor is flooded and left to show any leak. Ask to see it.
  5. Screed and tilingThe floor is laid to fall towards the trap, then the walls and floor are tiled and grouted.
  6. FittingsVanity, toilet bowl, mirror and tub go in last, once the grout is dry. Book us at least a week ahead, ideally two to three.
  7. HandoverCheck it with water before the last payment (next section).

Handover: what to check before the last payment

Do this with your contractor there, in daylight, with the water on. It takes fifteen minutes and is far easier now than after you move in.

Homeowner running water onto a newly tiled HDB toilet floor to check it drains
Illustration: run the hand shower across the floor and watch every drop reach the floor trap.
  • Water runs to the trap. Spray the whole floor. Puddles mean the falls are wrong, and they only get worse.
  • No damp below. Ask your downstairs neighbour, or the contractor, to check their ceiling after the ponding test and after handover.
  • Tiles sound solid. Tap them with a coin. A hollow sound over a large patch is worth raising now.
  • Every fitting tested. Run each tap, flush the toilet bowl a few times, fill and drain the basin, and look underneath for drips.
  • Paperwork in hand. The warranty in writing, and the permit if one was needed.

Where HERA fits in

We come in at step 6, and sometimes instead of a contractor altogether. This year 167 people asked us how to fit our install around their own contractor or interior designer.

What we do

  • Supply vanities, toilet bowls, bathtubs, mirrors and taps
  • Install them on your existing water and waste points
  • Remove an old vanity or tub, priced from your photos
  • Help you choose sizes before your contractor starts

Not us: your contractor's job

  • Hacking, overlay and tiling
  • Waterproofing and the ponding test
  • New or moved pipes and water points
  • The HDB permit
80cm vanity cabinet in Slate Grey with a mirror cabinet in a Bishan HDB flat
Fitted by HERA: an 80cm vanity in Slate Grey and a mirror cabinet at Blk 535C Bishan St 13, an HDB flat. Both went onto the water and waste points already there.
Bathrooms we fitted after the renovation. Real HERA installs in HDB flats and condos, photographed by our team. Tap one to see the whole job.

Planning the room itself? Our small bathroom vanity and storage ideas and HDB bathroom waterproofing guide are good next reads.

Questions people ask about bathroom contractors

Do I need an HDB approved contractor to renovate my toilet?

Yes. HDB says the renovation contractor you engage must be listed in its Directory of Renovation Contractors (DRC).

Look the company up on HDB's "Looking for Renovation Contractors" e-Service before you pay anything.

Do I need a permit to renovate an HDB toilet?

You need an HDB permit to remove existing floor finishes, to hack or alter walls, and to raise the floor level in a bathroom. Your contractor applies, with a floor plan showing the works.

Swapping a vanity, basin or bathtub on the pipes you already have does not touch the finishes. A toilet bowl swap must be done by a PUB licensed plumber.

Can I renovate the toilet in a new BTO flat?

Not the tiles, for the first 3 years: HDB does not allow wall or floor finishes in new toilets to be removed in that time. You can overlay new tiles on the old ones instead.

A like-for-like swap that leaves the tiles untouched does not remove any finishes, so a new vanity or a toilet bowl on the same outlet is not held back by the rule.

How much does a toilet renovation cost in Singapore?

Published 2026 cost guides put a full renovation of one HDB toilet at roughly $3,000 to $8,000, with larger or premium jobs going higher. Overlay jobs sit at the lower end, and hacking, new pipes and premium tiles push it up.

Fittings are usually extra. Get three itemised quotes for the same scope and compare them line by line.

How long does a toilet renovation take?

Contractors commonly quote two to three weeks of site work for one toilet that is hacked and retiled, plus the wait for tiles and fittings.

Noisy works such as hacking are only allowed on weekdays, 9am to 5pm, so public holidays stretch the schedule.

Does HERA do toilet renovation?

No. We supply bathroom fittings and install them, but we do not do tiling, overlay, waterproofing or repiping, and our bundles do not include renovation works.

We fit vanities, toilet bowls, bathtubs, mirrors and taps on your existing water and waste points once your contractor has finished.

When should the vanity, toilet bowl and bathtub go in?

After the tiling and waterproofing are done, so nothing gets scratched or chipped during the works.

Book the install at least a week ahead, ideally two to three weeks, and tell us early if the renovation runs late.

Pick your fittings before the tiler starts

Bring your floor plan, or your contractor. We'll show you vanities, toilet bowls and tubs that suit the pipes you have, so the sizes go into the plan early.

601 MacPherson Rd, #04-24 Grantral Mall · Mon: 11am to 7pm · Tue to Fri: 11am to 8pm · Sat & Sun: 11am to 7.30pm · How to find us

  • Bring your contractor or interior designer along to the showroom
  • Fittings delivered and installed by HERA's own team once the tiling is done
  • Home measuring visit: $30 on-site consultation, not refundable, plus a $108 voucher to use on HERA products
WhatsApp Book a visit