The home
An HDB flat at Blk 638B Tampines St 62, in Tampines, part of Tampines GreenVines. The block was completed in 2023 and has 4-room and 5-room flats.
The choice
The HERA 1018.
The fit
HERA's own team delivered and installed it. A freestanding HERA bathtub sits on the existing floor and connects to the existing floor trap with a flexible outlet, so nothing is hacked, and the install usually takes around 30 to 45 minutes.






