The home
An HDB flat at Blk 841 Jurong West St 81, in Jurong West, part of Nanyang Pearl. The block was completed in 1992 and has Executive flats.
The choice
The HERA 1018.
The fit
HERA's own team delivered and installed it. A freestanding HERA bathtub sits on the existing floor and connects to the existing floor trap with a flexible outlet, so nothing is hacked, and the install usually takes around 30 to 45 minutes.






